Haven / Apps & SDK

Build real apps on top of your data

MindooDB Apps are real web applications that run inside Haven under strict permissions. They can be externally hosted or bundled into Haven itself. Describe the app your team is missing and the App Builder writes, publishes, and installs it for you - no coding required. Or build it by hand with the MindooDB App SDK, using the same context files and example repos the Haven team publishes.

In the browser Start right away at haven.mindoodb.com, nothing to install. Desktop app For macOS and Windows: local database, works offline. How the App Builder works Build with your own agent
Concept

What a MindooDB App is

A MindooDB App is a web application that talks to Haven through a secure bridge. It can ship as a small tile inside a workspace page or take over a full browser tab - the API is the same.

  • Runs inside Haven - the app is rendered in an iframe or an opened window and communicates with Haven over a MessagePort bridge.
  • Sees what Haven grants - databases, views, and operations are all capability-based.
  • Online or offline - Haven-hosted bundles keep working when the network does not.
  • Works across tenants - a single app can consume data from multiple databases or tenants if granted.
Haven Applications page for adding, importing, configuring, launching, and placing apps on workspace pages
Applications page: configure and add applications, launch them directly, or place them on workspace pages.
Hosting models

Externally hosted or Haven-hosted

Choose the delivery model that fits your team and threat model:

Externally hosted

Deploy as a standard static web app on your own origin. Haven embeds it in a sandboxed iframe and connects via the SDK bridge.

  • Use your existing CI/CD, CDN, and auth story.
  • Great for early development and public demos.
  • Requires network reachability to the hosting origin.
Haven-hosted bundle

Import the app as a bundle into Haven. Haven's service worker serves it locally, which keeps the app usable offline and lets Haven enforce a stricter opaque-origin sandbox.

  • Runs offline - perfect for field use and secure environments.
  • Stricter sandbox than an external origin.
  • First-class fit for Haven Enterprise in-house app stores.
Capability model

Haven decides what each app can see

Haven Configure application dialog showing per-database capabilities for an app
Per-app capability grid: grant write, delete, history, attachment, and view-creation permissions per database and per app.
  • Read / create / update / delete per database.
  • History access for revision listing and time-travel.
  • Attachment operations including chunked streaming reads and writes.
  • View creation - let the app define its own virtual views or restrict it to Haven-configured views.
  • No ambient authority - apps cannot reach Haven storage, cookies, or other apps without an explicit grant.

See the full isolation design in Security & Privacy - sandboxing.

MindooDB App SDK

Everything you need to build a real app

The SDK is a typed TypeScript package that wraps the bridge protocol and exposes ergonomic APIs for the things apps actually need.

Launch context & events
  • Runtime mode, user info, and viewport.
  • Current light or dark theme from Haven so the app can match on first paint.
  • Mapped databases, views, tenant context, and launch parameters.
  • Live events: when the user toggles Haven's theme or resizes the viewport, every embedded app receives the update and can re-render instantly.
  • Host-rendered menus when overlays need to escape iframe bounds.
  • Host-owned drag across iframe borders: one app copies typed payloads - plain text, Markdown, JSON, or a document reference - into another app that is visible at the same time.
Documents & history
  • CRUD with filtered, projected, and metadata-only listing.
  • Summary-backed ad-hoc queries with declarative filters, dynamic sorting, and paging.
  • Full-text search integrated into queries: relevance-ranked matching over document text, rich-text content, and attachment text.
  • Live queries: the host pushes new results whenever the outcome actually changes.
  • Ad-hoc views created on the fly to categorize and aggregate query results - no upfront view configuration in Haven needed.
  • Deleted-document visibility for sync and cleanup flows.
  • Changefeed cursor checkpoints for incremental sync and indexes.
  • Revision listing and loading snapshots at any timestamp.
Attachments
  • List, upload, download, and remove attachments.
  • Chunked binary streaming for large files.
  • Preview support for images, PDFs, Markdown, text, Office, audio, and video.
  • Preview also works from historical snapshots.
Virtual Views
  • Categorized, sorted, filtered, and aggregated queries - think pivot table.
  • Haven-configured views and app-defined multi-database views.
  • Summary-first index builds - views are fed from the persistent summary buffer without materializing documents.
  • Typed view-language builder for formulas, filters, and derived columns.
  • Stateful navigator with paging, traversal, selection, and range lookups.
  • Host-pushed live updates via onDidUpdate - no polling required.
Testing & dev loop
  • App-test helpers and bridge protocol test helpers in mindoodb-app-sdk/testing.
  • Local development against a running Haven instance with hot reload.
  • Deploy as a standard static web app or as a Haven-hosted bundle.
Example code

Two tabs: a minimal launch + read snippet, and a copy-pasteable AI prompt you can feed to your agent of choice.

App Store

Install apps straight from Haven's App Store

Haven ships with a built-in App Store, which you open from the Haven App Store tile on the workspace Start page. Browse the catalog as a visual grid of app tiles, open an app to see its full description, version, and screenshot gallery, and install it with one click - Haven asks for the target tenant and lets you rename the app on the way in.

  • Rich catalog - every app comes with an icon, localized description, screenshots, and version info.
  • One-click install - pick a tenant, optionally adjust the application name, done. Permissions are preconfigured per app.
  • Your own store - custom Haven deployments can point at a self-hosted app store serving the same folder structure, so enterprises curate exactly which apps their users see. A natural fit for Haven Enterprise.
Haven App Store overview showing a grid of app tiles with icons, versions, and screenshots
The App Store overview: every app as a tile with icon, version, and a short summary.
Haven App Store detail view of Mindoo Vega with screenshot gallery, description, and Install button
The detail view combines the rendered description, a screenshot gallery, and the Install button.
Haven App Store install step with editable application name and tenant selection
Installing an app: choose the target tenant and adjust the application name before Haven registers it.
No coding required

Describe the app, and the App Builder ships it

The App Builder is itself an app in Haven's App Store. You give it a name, one sentence about the purpose, and a brief describing what the app should do. It sets up the project, puts it on the web, has an AI agent write it, and hands the finished app back to Haven for installation. What comes out is not a throwaway prototype: it is an ordinary MindooDB App with its own source code, free to use every platform feature, and yours to extend for as long as you like.

What happens after you hit "Build my app"
  1. Your project is created from the official starter template, which already carries the SDK documentation the AI needs to write a real Haven app.
  2. The app gets its own web address, with hosting that redeploys itself whenever the code changes.
  3. An AI agent picks up your brief and builds the app, publishing each step as it goes.
  4. Haven installs the finished app. You approve it in Haven's own dialog and grant it databases like any other app.
What you bring
  • GitHub and Cloudflare connect with a click, on their own consent screens. There is no account ID or token to look up.
  • A Cursor API key for the AI agent. Without one the app is still created and published, just not written for you.

No coding required

The App Builder, step by step

App Builder setup page with the GitHub, Cloudflare, and Cursor accounts connected
Connect the accounts once

GitHub, Cloudflare, and Cursor connect on their own consent screens. The tokens are sealed in your own App Builder database, so the next app is just a name and a button.

Scroll inside the screenshot to see the whole setup page.

1 9
Getting started

Twelve apps to learn from

Mindoo publishes MindooDB Apps you can study or install. Nine are first-party productivity apps you can use in Haven today (Vega, Mindoo Cairn for shared field maps, TodoManager, TeamEdit for collaborative markdown and Word documents, TeamGrid for collaborative spreadsheets with formulas, charts, and Virtual View Sheets, TeamSlides for collaborative PowerPoint-compatible presentations, Contacts as a shared address book for companies and their people, TeamSketchbook for collaborative hand drawing, and the Teacher's Desk workspace for teachers), one is a beautiful responsive weather tile that doubles as a reference for the SDK's UX surface, and one is a guided tour of the SDK you can fork as the starting point for your own app. The last one is the App Builder that creates new apps for you.

Productivity
Mindoo Vega

Collaborative mind mapping, idea generation, and project planning - the same tree-structured nodes render as a Mindmap, a Kanban board, a Gantt chart, or a spreadsheet, with task fields (assignee, start/end dates, priority, status, effort, and cost), tags, and integrated full-text search. The spreadsheet brings around 280 Excel-compatible functions and charts and can write your edits back to the nodes, and time travel opens the plan as it stood on an earlier date. Built on MindooDB's end-to-end encrypted sync.

Field map
Mindoo Cairn

A shared field map for teams on smartphones, tablets and desktop. Workbooks collect pins with photos, areas, measurements and sketches drawn with pen, touch or mouse, each encrypted with a shared key or readable only by selected users. Use it as a tree inventory with inspections and measures after the FLL guideline, for inspections such as playground or fire hydrant checks, in crisis areas around the world where peer-to-peer sync keeps relief work in step even without a server, or playfully for scavenger hunts with mini games. Because MindooDB stores every change append-only, time travel compares a workbook at two points in time, side by side or with a slider. Maps and workbooks work offline, and sync keeps every device up to date.

Productivity
Mindoo TeamEdit

Collaborative editor for markdown and Word documents. Several people on several devices can edit the same file at once - including .docx, through a collaborative web editor for Word's own format, so no Word licence is needed. Saves merge cleanly via MindooDB's Automerge text CRDT under the hood, and it ships attachment-backed images and a Milkdown WYSIWYG editor.

Collaborative editing
Mindoo TeamGrid

Collaborative spreadsheet. Around 280 Excel-compatible formula functions, Column, Bar, Line, and Pie charts, XLSX file and clipboard round-trip, and spreadsheet templates - all on a stable-ID document model so concurrent row, column, and cell edits across laptops and phones merge cleanly. The headline feature is Virtual View Sheets: drop any Haven Virtual View, including views that combine private, work, and partner-tenant data, into a worksheet as ordinary cells you can write formulas and draw charts over.

Presentations
Mindoo TeamSlides

Presentations your team edits together: PowerPoint-compatible slides with charts, tables and animations, merged even offline – with .pptx import and export.

Address book
Mindoo Contacts

The address book for companies and the people who work there – for yourself or shared with your team: all contact details, birthdays and social profiles, vCard import and export, revisions, encrypted in MindooDB.

Productivity
Mindoo TeamSketchbook

A collaborative sketchbook and infinite canvas for teams: sketch freely, annotate imported PDFs or GoodNotes notebooks, present with a laser pointer, and compare any two page revisions side by side or with a reveal slider. Sticky notes, paper styles, pressure-sensitive pens, and tiled canvas printing for wall-sized posters — with every stroke merging live across devices so nobody overwrites anyone else's work. Works fully offline in the field, then syncs when you reconnect.

Productivity
Mindoo Teacher's Desk

A digital workspace that brings a teacher's whole day together in one place: timetable and calendar without duplicate data entry, lesson planning and documentation, materials with OCR search, class registers with seating plans, a flexible grade book, tasks, and hand-written notes - encrypted, offline-capable, and conflict-free across devices.

Productivity
Mindoo TodoManager

A Covey-style four-quadrant task board for personal and team todos: organise by importance and urgency, work through quadrants in priority order, and drag tasks across desktop, tablet, and phone layouts. Light and dark themes match Haven, with local-first editing and real-time sync so everyone stays on the same list without overwriting each other.

Responsive tile
Mindoo Weather

iOS-Weather-style forecast tile for one or more locations. A swipeable glass card over a full-bleed photographic background adapts to the tile size Haven reports - narrow tiles show a single location with dots, wider tiles show 2-4 at once. Uses the keyless Open-Meteo APIs so no secrets ever leave the sandbox. Great reference for launch parameters, viewport events, and responsive embedding.

Developer template
MindooDB App SDK example

Reference app that demonstrates the SDK surface - launch context, documents, attachments, views. Fork it as the starting point for your own app.

No coding required
App Builder

Describe the app your team is missing - an AI agent writes it, publishes it to the web, and Haven installs it. Creates the GitHub repository, the Cloudflare hosting, and the deployment pipeline for you. See how it works.

Screenshot gallery

See the demo apps running in Haven

Browse the apps as they run inside Haven - Vega with its mind map, Kanban, Gantt, and spreadsheet views, the Mindoo Cairn field map for tree inventories, crisis areas and scavenger hunts, TodoManager, the Teacher's Desk workspace for teachers, the TeamEdit collaborative editor for markdown and Word documents, the TeamGrid collaborative spreadsheet with charts and Virtual View Sheets, the TeamSlides presentation editor with PowerPoint-compatible slides, the Contacts address book for companies and their people, the TeamSketchbook collaborative hand-drawing app, and the responsive Weather tile on iPhone.

Mindoo Vega mind map for an Aurora product launch project, where each topic node shows an attached panel with assignee, status, priority, start and end date, progress, and planned versus actual effort and cost
Mindoo VegaDesktop
Every node carries its task data

A mind map where every node carries its task data: assignee, status, priority, dates, progress, effort and cost.

151
Bring your own agent

Or point your own coding agent at the platform

The App Builder above does all of this for you, repository and hosting included. If you would rather stay in your own toolchain, every file a coding agent needs to write a MindooDB App is already published. Point your agent of choice at the following resources and it can scaffold real, working apps.

Resources to feed an AI agent
  • /llms-full.txt - full platform context, including the MindooDB App SDK, Haven bridge, and server setup.
  • /llms.txt - short index that lets an agent discover the rest.
  • Open-source reference apps to fork: mindoodb-app-example (a guided tour of the SDK's database, view, and event APIs) and mindoodb-app-weather (a beautiful, responsive tile focused on the UX side of the SDK - launch parameters, viewport events, theming).
  • MindooDB App SDK README for the capability model and API surface.
Example prompt

Copy the prompt from the AI build prompt tab in the SDK code block above, drop it into Cursor, Claude, ChatGPT, or any other coding agent, and let it generate the app from the published context.

Three ways to get an app

Describe it, build it, or let us deliver it

Describe it to the App Builder

No coding required: write a brief and the builder creates the repository, the hosting, and the deployment, has an AI agent build it, and installs it in Haven. How it works.

Build it yourself

Fork the example and use the typed SDK, or point your own coding agent at /llms-full.txt. Ship an externally hosted app or a Haven-hosted bundle.

Delivered by Mindoo GmbH

Let the team behind Haven build the app with you. See professional services.